Dominique Perrault Architecture

chargement

1996   |   2008

Court of Justice of the European Communities

Luxembourg, Luxembourg

Invited to create a new extension and to triple the Court’s capacity from 50,000 sq metres (538,195 sq ft) to 150,000 sq metres (1.6 million sq ft), Perrault’s challenge was not only to increase space but also to give harmony to a building that had already been extended three times. First inaugurated in 1973, when the European Community included only six member countries, the Court of Justice was extended in 1988, 1993 and 1994. As Perrault saw it, the scheme’s challenge was threefold: functional, urban and institutional. First, the Court required an additional 100,000 sq metres (1.08 million sq ft) to house more than 2,000 judges, clerks and translators. Second, successive expansions, with sometimes contradictory designs needed to be rationalized and brought together to function as a whole. It was therefore not only necessary to create extra space but to unify the whole, creating a building that would seem more like an harmonious “injection” than a fourth extension. Third, Perrault’s scheme sought to reinforce the symbolic importance of the prestigious institution.
The original building, made of corten steel, is hollowed out, to accommodate the courtrooms, which is encircled by a perfectly orthogonal ring hosting offices, chambers for the judges, advocate generals, and the Great Hall of justice.
On the lower level of this major body, the “grande galerie” is reorganized and extended, serving as a spinal cord, to provide circulation between the different extensions as well as to the two new towers, which provide office space for more than 600 translators and legal officers working in 23 languages. With a height of 100 metres each, the new towers are now the tallest in Luxembourg.
The vast space to the north, designed to be discreet, creates a major access across a large porch to the entrance hall and to the meeting rooms.
In the basement, the courtroom’s ceiling is dressed with lights encircled in an anodized gold-tinted aluminium mesh, giving the chamber a majestic and authoritative atmosphere while also providing a lyrical and poetic feel.
The material qualities of the anodized gold-tinted aluminium mesh are a major component of the new unity introduced in the different extensions. It has been employed throughout the project, for the sun-shades of the two towers, as a screen for the judges’ chambers, as well as on the ceiling of the main courtroom. The rhythm of the metallic mesh, the dazzling texture, and the relief of its folds bestow a genuine visual identity to the 76,000 sq metre (818,057 sq ft) plot area.
With Perrault’s scheme, the Court is endowed with a main courtroom, four smaller courtrooms, offices of the presidency, the members and the court registry office, translators’ offices (24,000 sq metres in two new towers – equivalent of 258,333 sq ft), library, restaurants, lounges, banks, parking garage and an esplanade of 23,000 sq metres (247,570 sq ft). The total built area is 100,000 sq metres (1,07 million sq ft).
In addition, since 2004, Perrault’s firm has been engaged to conduct an urban planning project, including landscape architecture, circulation, transport and a mixed-use program for the development of the entrance to the Kirchberg plateau. The aim is to give a more urban look and feel to the Porte de l’Europe by creating a better relationship between the different elements of the district and its various users. The work is to be completed in 2020.
client European Court of Justice
architect Dominique Perrault Architecte, Paris
associated architects Bureau CJ4 (Dominique Perrault Architecte, Paczowski & Fritsch, m3 architectes), Luxembourg
engineers Perrault Projets (architectural engineering); Ralf Rache (façades); Jean-Paul Lamoureux (acoustics & lighting); Gehl, Jacoby & Associés SA, Schroeder & Associés SA, TR-Engineering SA,  (civil engineering); Felgen & Associés SA, Bevilacqua & Associés SA, (electrical engineering); Jean Schmit Engineering SARL (thermal engineering); RMC-consulting (sanitary engineering); Cabinet Casso et cie (security); AIB Vinçotte Luxembourg asbl, Secolux (technical control); Geprolux SA (coordinator)
project pilot Geprolux SA, Luxembourg
location Kirchberg platform, Grand Duché du Luxembourg
site surface 76,000 m²
built surface 100,000 m
²
built volume 380,000 m3
urban design square and spaces related to the tramway
start of final design June 2002
construction start April 2004
duration of construction 4 years

programme
· The former palace, 20,168 m ² : asbestos removal and entire rehabilitation of the metal structure, 5 courtrooms including a great formal room (41 members and 300 seats), translation booths, adjoining deliberation rooms and hall of low courts.
· The ring, 16,851 m ² : offices dedicated to the law offices (judges, Advocates General and their colleagues), 40 member offices, great deliberation room.
· The towers, 34,208 m ² : offices on 24 floors (107 meters high) for all translation services (1,000 persons and 23 languages).
· Building at the foot of the towers, 5,079 m ² : administration offices, additional services, archives.
· The gallery, 24,131 m ² : vertebral column which ensures the functional unity between the former buildings and the newer constructions. It contains the restaurants, the library (84 seats and 7.5 km of shelving), professional training rooms, public services (kiosks, banks…) gives direct access to the towers, the ring and the Court-house.
· The public esplanade and the parking area, 23,589 m ² : it leads to the main entrance of the Court, in the axis of the Rue Charles-Léon Hammes. 700 parking spaces are located under the esplanade for the used of the Court members.